|  | Pellet Stove Chimneys (SPNP)    
    
    
    
                 
       
SPNP 90° Black Steel Tee with Inspection Port for Pellet Flue SystemsProduct DescriptionThe SPNP 90° Tee with Inspection Port is an "all-in-one" solution made from black carbon steel, designed to connect a horizontal flue pipe run to the main vertical stack. This chimney tee creates a 90-degree junction and features an integrated inspection port for convenient system maintenance, eliminating the need to install separate components like a cap or a condensate drain. Suitable for pellet stoves, pellet boilers, and other low-temperature, fan-assisted single-wall flue systems. Key Features
	Easy Access for Maintenance: The integrated inspection port with a sealed lid provides quick and easy access for cleaning and inspecting the flue without disassembly of the system.Secure Main Line Connection: Allows a horizontal run from the pellet appliance to be safely and securely connected to the main vertical flue or chimney.Complete Seal (Class P1): The socket connections with their silicone gaskets, combined with the sealed inspection port, ensure the pressure-tight integrity of the entire component, essential for modern fan-assisted boilers.European Quality and Safety: The product is certified and CE marked, confirming its full compliance with the European standard for flue systems EN 1856-2. Technical Specifications
	
		
			| Parameter | Value |  
			| Article | PRGRASPNP09080 |  
			| Component Type | 90° Tee with Inspection Port |  
			| Inner Diameter | Ø 80 mm |  
			| Branch Angle | 90 degrees |  
			| Inspection Port | Integrated hatch with sealed lid |  
			| Material Grade | Carbon Steel DC01 |  
			| Wall Thickness | 1.2 mm |  
			| Seal | Silicone gasket, included |  
			| Temperature Class | T200 (up to 200°C) |  
			| Pressure Class | P1 (pressure-tight) |  
			| Availability | In Stock |  Important Limitations
	For Pellet Appliances Only: Do not use with wood-burning stoves, open fireplaces, or other solid fuel boilers where flue gas temperatures exceed 200°C and there is a risk of soot fire.Check Seal After Maintenance: Before starting the boiler after each cleaning, ensure the inspection port lid is closed firmly and securely sealed.For Indoor Installation Only: This is not an insulated (twin-wall) pipe and is intended for installation only inside heated spaces. |  |