Pellet Stove Chimneys (SPNP)

SPNP Black elbow 90° with cleanout

manufacturer: PRODMAX | Kods: PRGRASPNP07

SPNP 90° Black Steel Elbow with Inspection Port or Pellet Stove & Boiler Flues

Product Description

The SPNP 90° Elbow with Inspection Port is a key component for pellet stove flue systems. This chimney elbow, made from black carbon steel, serves two functions: it changes the direction of the flue run by 90 degrees and provides convenient access for maintenance. It is constructed from welded segments to create a smooth bend and features a sealed inspection hatch. This allows you to bypass structural obstacles and correctly connect pellet appliances to the vertical chimney stack. Suitable for pellet stoves, pellet boilers, and other low-temperature, fan-assisted heating appliances.

Key Features

  • Easy Maintenance: The integrated inspection port with a sealed, latched lid provides quick and easy access for cleaning and inspecting the flue without disassembling the system.
  • 90-Degree Change of Direction: Allows the flue path to be altered by 90 degrees to bypass obstacles or to create a horizontal connection from the appliance.
  • Complete Seal (Class P1): The socket connection with its silicone gasket, combined with the sealed inspection port, guarantees the pressure-tight integrity of the entire component, essential for modern, fan-assisted boilers.
  • European Quality and Safety: The product is certified and CE marked, confirming its full compliance with the European standard for flue systems EN 1856-2.

Technical Specifications

Parameter Value
Article PRGRASPNP07080
Component Type 90° Elbow with Inspection Port
Inner Diameter Ø 80 mm
Angle 90 degrees
Inspection Port Integrated hatch with sealed lid
Material Grade Carbon Steel DC01
Wall Thickness 1.2 mm
Seal Silicone gasket, included
Temperature Class T200 (up to 200°C)
Pressure Class P1 (pressure-tight)
Availability In Stock

Important Limitations

  • For Pellet Appliances Only: Do not use with wood-burning stoves, open fireplaces, or other solid fuel boilers where flue gas temperatures exceed 200°C and there is a risk of soot fire.
  • Check Seal After Maintenance: Before starting the boiler after each cleaning, ensure the inspection port lid is closed firmly and securely sealed.
  • For Indoor Installation Only: This is not an insulated (twin-wall) pipe and is intended for installation only inside heated spaces.

© 2012-2025 SIA "AKVILON"
e-mail: info@akvilon.lv | phone: +371 26336845, +371 20125412 | www.akvilon.eu | www.dumvadi.lv | e-shop - shop.akvilon.eu |